Willow Bend

> Willow Bend

Willow Bend

Willow Bend

Client: Scarborough-Sembler
Location: Pasco County, FL
Size: 740 Acres
Service: Land Development & Entitlements

Highlights:
Contact Staff: Bruce T. Kaschyk, AICP
 

Genesis provided engineering and survey design services for Master Planning and Phase I construction of the 740-acre Willowbend Development in Pasco County, Florida. Services included surveying, preparation of design drawings, contract documents, permit applications, for both on-site and offsite infrastructure for the 175 unit Phase I development.

Stormwater management system required computer modeling of a 800 acre watershed and features extensive use of existing wetlands for stormwater treatment and attenuation. Phase I construction plans included a 250,000 gpd wastewater treatment plant with infiltration ponds and two 1,000 gpm wells with chlorination facilities for water supply. Construction services included construction staking, construction inspection, and assistance to the developer in contract management. Total units are 950 max.

www.GenesisGroup.com

Willow Bend


Pasco County, FL

Client:

Scarborough-Sembler

Location:

Pasco County, FL

Size:

740 Acres

Service

Land Development & Entitlements

Highlights:

Civil Engineering
Landscape Design

Contact Staff:

Bruce T. Kaschyk, AICP

Willow Bend

Genesis provided engineering and survey design services for Master Planning and Phase I construction of the 740-acre Willowbend Development in Pasco County, Florida. Services included surveying, preparation of design drawings, contract documents, permit applications, for both on-site and offsite infrastructure for the 175 unit Phase I development.

Stormwater management system required computer modeling of a 800 acre watershed and features extensive use of existing wetlands for stormwater treatment and attenuation. Phase I construction plans included a 250,000 gpd wastewater treatment plant with infiltration ponds and two 1,000 gpm wells with chlorination facilities for water supply. Construction services included construction staking, construction inspection, and assistance to the developer in contract management. Total units are 950 max.