West Street Streetscape

> West Street Streetscape

West Street Streetscape

West Street Streetscape

Client: City of Bainbridge
Location: Bainbridge, GA
Size: 0.119 miles
Service: Transportation & Mobility

Highlights:
Contact Staff: James P. Sullivan, P.E.
 

This High Priority Project is the third phase funded through Georgia Department of Transportation (GDOT)and includes reconstruction of existing sidewalks along several city blocks in downtown Bainbridge. The new sidewalks will be enhanced and decorative through landscaping and decorative lighting, street furniture will be added, including benches, tree grates and trash cans. The proposed landscaping will be irrigated through underground bubblers.

The streets and sidewalks in downtown Bainbridge are confined by buildings which abut the existing city right-of-way. Construction of this project includes reconnecting to building entrances, reconfiguring on street parking and accommodating existing roof drains. Proposed trees, lights and street furniture must be placed so as not to restrict business activity.

Genesis adhered to all GDOT standards and GDOT Plan Presentation Guide.

www.GenesisGroup.com

West Street Streetscape


Bainbridge, GA

Client:

City of Bainbridge

Location:

Bainbridge, GA

Size:

0.119 miles

Service

Transportation & Mobility

Highlights:

Construction Document Preparation
Environmental Analysis
Landscape Design
Public Involvement
Sidewalk Design
Stormwater Design
Streetscape Design
Surveying
Utility Coordination

Contact Staff:

James P. Sullivan, P.E.

West Street Streetscape

This High Priority Project is the third phase funded through Georgia Department of Transportation (GDOT)and includes reconstruction of existing sidewalks along several city blocks in downtown Bainbridge. The new sidewalks will be enhanced and decorative through landscaping and decorative lighting, street furniture will be added, including benches, tree grates and trash cans. The proposed landscaping will be irrigated through underground bubblers.

The streets and sidewalks in downtown Bainbridge are confined by buildings which abut the existing city right-of-way. Construction of this project includes reconnecting to building entrances, reconfiguring on street parking and accommodating existing roof drains. Proposed trees, lights and street furniture must be placed so as not to restrict business activity.

Genesis adhered to all GDOT standards and GDOT Plan Presentation Guide.