string(885) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'US-301-from-Myrtle-Street-to-DeSoto-Road' " US-301 from Myrtle Street to DeSoto Road | Genesis

US-301 from Myrtle Street to DeSoto Road

> US-301 from Myrtle Street to DeSoto Road

US-301 from Myrtle Street to DeSoto Road

US-301 from Myrtle Street to DeSoto Road

Client: FDOT District 1
Location: City of Sarasota, FL
Size: Length: 1-mile
Construction Cost: $8.3 million
Service: Genesis CEI Services

Highlights:
Contact Staff: Tony Harvey
 

This American Recovery and Reinvestment Act (ARRA) Design Build roadway construction project involved the multilane reconstruction of approximately 1 mile of roadway from a four lane rural highway to six lane divided highway with medians.

The work performed on this project included but was not limited to:

  • Highway lighting
  • Signalization
  • Storm drainage
  • Box culvert installation
  • Utility improvements
www.GenesisGroup.com

US-301 from Myrtle Street to DeSoto Road


City of Sarasota, FL

Client:

FDOT District 1

Location:

City of Sarasota, FL

Size:

Length: 1-mile
Construction Cost: $8.3 million

Service

Genesis CEI Services

Highlights:

Construction Engineering and Inspection
Scheduling
Utility Coordination

Contact Staff:

Tony Harvey

US-301 from Myrtle Street to DeSoto Road

This American Recovery and Reinvestment Act (ARRA) Design Build roadway construction project involved the multilane reconstruction of approximately 1 mile of roadway from a four lane rural highway to six lane divided highway with medians.

The work performed on this project included but was not limited to:

  • Highway lighting
  • Signalization
  • Storm drainage
  • Box culvert installation
  • Utility improvements