Triple Creek - Phase 2-4

> Triple Creek - Phase 2-4

Triple Creek - Phase 2-4

Client: Green Pointe Communities, LLC
Location: Hillsborough County, FL
Size: 1,000 +/- acres
Service: Community Design & Regional Planning

Contact Staff: Kyle L. Thornton, P.E.
 

This is a multi-faceted project related to new phases of development within the Triple Creek Community in Riverview, Florida. The scope of work includes master infrastructure design and permitting for a new access road, utility mains, and landscape buffers associated to be constructed by the master developer to cross an existing creek and provide connectivity to the new 200-lot, Phase 2 area being designed and permitted by Genesis under a separate contract with Mattamy Homes. The project will also include master stormwater and utility designs for an additional 500 lots in the Phase 3 and 4 areas, along with obtaining a preliminary plan approval for those phases. Also included will be off-site intersection improvements and signalization (by others) of the Big Bend and Balm Riverview Road intersection.

www.GenesisGroup.com

Triple Creek - Phase 2-4


Hillsborough County, FL

Client:

Green Pointe Communities, LLC

Location:

Hillsborough County, FL

Size:

1,000 +/- acres

Contact Staff:

Kyle L. Thornton, P.E.

Triple Creek - Phase 2-4

This is a multi-faceted project related to new phases of development within the Triple Creek Community in Riverview, Florida. The scope of work includes master infrastructure design and permitting for a new access road, utility mains, and landscape buffers associated to be constructed by the master developer to cross an existing creek and provide connectivity to the new 200-lot, Phase 2 area being designed and permitted by Genesis under a separate contract with Mattamy Homes. The project will also include master stormwater and utility designs for an additional 500 lots in the Phase 3 and 4 areas, along with obtaining a preliminary plan approval for those phases. Also included will be off-site intersection improvements and signalization (by others) of the Big Bend and Balm Riverview Road intersection.