St. Pete Beach - Citywide Landscape Improvements

> St. Pete Beach - Citywide Landscape Improvements

St. Pete Beach - Citywide Landscape Improvements

St. Pete Beach - Citywide Landscape Improvements

Client: City of St. Pete Beach
Location: City of St. Pete Beach, FL
Size: Citywide
Service: Public & Civic Infrastructure

Highlights:
Contact Staff: Bruce T. Kaschyk, AICP
 

The City of St. Pete Beach selected Genesis to design Citywide roadway landscape improvements, from the Pinellas Bayway Bridge to the south, throughout Gulf Boulevard and Blind Pass Road, and along 75th Avenue to the Corey Avenue Bridge.

Genesis provided professional Landscape Architecture services for landscape and irrigation improvements that included design for a mixture of both new and existing landscape medians and roadside areas. A bold statement was desired for this beachside community; therefore, specimen Medjool Date Palms became the centerpiece of design, with shrubs and groundcovers carefully selected for attractiveness, durability, ease of maintenance, and adherence to safety and setback criteria.

The City subsequently requested aesthetic lighting design and construction assistance services. Genesis teamed with an electrical engineer to design low voltage solar uplighting for palms in more than 35 roadway medians.

Currently, Genesis is providing these same services for the portion of the Pinellas Bayway within the City.

This project required extensive coordination with City staff and FDOT engineers. Ultimately, Genesis successfully petitioned the FDOT for two (2) design variations in order to achieve the project’s vision.

www.GenesisGroup.com

St. Pete Beach - Citywide Landscape Improvements


City of St. Pete Beach, FL

Client:

City of St. Pete Beach

Location:

City of St. Pete Beach, FL

Size:

Citywide

Service

Public & Civic Infrastructure

Highlights:

Linear Project Landscape Design
Planting Design

Contact Staff:

Bruce T. Kaschyk, AICP

St. Pete Beach - Citywide Landscape Improvements

The City of St. Pete Beach selected Genesis to design Citywide roadway landscape improvements, from the Pinellas Bayway Bridge to the south, throughout Gulf Boulevard and Blind Pass Road, and along 75th Avenue to the Corey Avenue Bridge.

Genesis provided professional Landscape Architecture services for landscape and irrigation improvements that included design for a mixture of both new and existing landscape medians and roadside areas. A bold statement was desired for this beachside community; therefore, specimen Medjool Date Palms became the centerpiece of design, with shrubs and groundcovers carefully selected for attractiveness, durability, ease of maintenance, and adherence to safety and setback criteria.

The City subsequently requested aesthetic lighting design and construction assistance services. Genesis teamed with an electrical engineer to design low voltage solar uplighting for palms in more than 35 roadway medians.

Currently, Genesis is providing these same services for the portion of the Pinellas Bayway within the City.

This project required extensive coordination with City staff and FDOT engineers. Ultimately, Genesis successfully petitioned the FDOT for two (2) design variations in order to achieve the project’s vision.