SR 30 (US 98) at Moylan Road Intersection Improvement

> SR 30 (US 98) at Moylan Road Intersection Improvement

SR 30 (US 98) at Moylan Road Intersection Improvement

Under Genesis’ Districtwide Minor Design contract with FDOT District Three, Genesis provided the design services needed for radius improvements at the intersection of SR 30 (US 98) and Moylan Road. The original scope included turn lanes along both roadways, however, through production and coordination with the District, the ROW and utility relocation costs exceeded the allocated budget for the project and radius improvements were provided to improve functionality of the intersection. Genesis was responsible for the roadway design, stormwater analysis, permitting, utility coordination, signing and pavement markings, specifications, cost estimation, ROW Support, and MOT for this project.

www.GenesisGroup.com

SR 30 (US 98) at Moylan Road Intersection Improvement


Bay County, FL

Client:

FDOT District 3

Location:

Bay County, FL

Service

Transportation & Mobility

Highlights:

Construction Cost Estimating
Engineering Design and Permitting
Roadway Design
Signage and Striping
Stormwater Analysis and Solutions Design
Utility Coordination

Contact Staff:

Nicholas A Grosso, P.E.

SR 30 (US 98) at Moylan Road Intersection Improvement

Under Genesis’ Districtwide Minor Design contract with FDOT District Three, Genesis provided the design services needed for radius improvements at the intersection of SR 30 (US 98) and Moylan Road. The original scope included turn lanes along both roadways, however, through production and coordination with the District, the ROW and utility relocation costs exceeded the allocated budget for the project and radius improvements were provided to improve functionality of the intersection. Genesis was responsible for the roadway design, stormwater analysis, permitting, utility coordination, signing and pavement markings, specifications, cost estimation, ROW Support, and MOT for this project.