River Hills Country Club

> River Hills Country Club

River Hills Country Club

River Hills Country Club

Client: Arvida Corporation
Location: Hillsborough County, FL
Size: 1,300 Acres/1,071 Units
Service: Land Development & Entitlements

Highlights:
Contact Staff: Bruce T. Kaschyk, AICP
 

Genesis provided engineering and survey design services for Master Planning and Phase I construction on the 1,300 acre River Hills Country Club Development.

Services included surveying, preparation of design drawings, contract documents, permit applications, for both on-site and off-site infrastructure for the 175 unit Phase I development, total units are 1,071 single family.

Stormwater management system required computer modeling of a 2,000 acre watershed and features extensive use of existing wetlands for stormwater treatment and attenuation.

Construction services included construction staking, construction inspection, and assistance to the developer in contract management.

Phase I construction plans included three wastewater pumping stations and a 300,000 gpd interim wastewater treatment plant producing reclaimed water for spray irrigation on the golf course.

www.GenesisGroup.com

River Hills Country Club


Hillsborough County, FL

Client:

Arvida Corporation

Location:

Hillsborough County, FL

Size:

1,300 Acres/1,071 Units

Service

Land Development & Entitlements

Highlights:

Civil Engineering
Environmental Permitting
Master Planning
Site Development Concept Planning
Surveying

Contact Staff:

Bruce T. Kaschyk, AICP

River Hills Country Club

Genesis provided engineering and survey design services for Master Planning and Phase I construction on the 1,300 acre River Hills Country Club Development.

Services included surveying, preparation of design drawings, contract documents, permit applications, for both on-site and off-site infrastructure for the 175 unit Phase I development, total units are 1,071 single family.

Stormwater management system required computer modeling of a 2,000 acre watershed and features extensive use of existing wetlands for stormwater treatment and attenuation.

Construction services included construction staking, construction inspection, and assistance to the developer in contract management.

Phase I construction plans included three wastewater pumping stations and a 300,000 gpd interim wastewater treatment plant producing reclaimed water for spray irrigation on the golf course.