Navarre Beach Park/DWH Program

> Navarre Beach Park/DWH Program

Navarre Beach Park/DWH Program

Navarre Beach Park/DWH Program

Client: FDEP/Florida State Parks
Location: Tallahassee, FL
Service: Parks & Recreation

Highlights:
Contact Staff: David W. Hutcheson, P.E., PSM
 

The work proposed under the Deepwater Horizon Natural Resource Damage Assessment Early Restoration Program (NRDA ERP) program for these projects includes the following: *** Navarre Beach Park Coastal Access and Dune Restoration Project: The restoration work proposed herein is on the Soundside of the park and includes construction of two new beach access boardwalks from existing pavilion/parking lot areas to the Santa Rosa Sound. The project will also include a new kayak/canoe launch and boardwalk facilities. Approximately 1 acre of dune habit will also be restored as a part of the project. The dune restoration would involve planting gaps in the existing dunes within the project area. *** Navarre Beach Park Gulfside Walkover Complex: The restoration work proposed includes constructing an entrance, driveway, and parking area; constructing a restroom facility; constructing pavilions with boardwalk connections; observation tower or deck; and constructing a dune walkover that will provide access to the beach. This project will be constructed between the two existing beach pavilions and will complement the architectural designs of these existing facilities.

GenesisHalff.com

Navarre Beach Park/DWH Program


Tallahassee, FL

Client:

FDEP/Florida State Parks

Location:

Tallahassee, FL

Service

Parks & Recreation

Highlights:

Civil Engineering
Parks and Recreation Planning

Navarre Beach Park/DWH Program

The work proposed under the Deepwater Horizon Natural Resource Damage Assessment Early Restoration Program (NRDA ERP) program for these projects includes the following: *** Navarre Beach Park Coastal Access and Dune Restoration Project: The restoration work proposed herein is on the Soundside of the park and includes construction of two new beach access boardwalks from existing pavilion/parking lot areas to the Santa Rosa Sound. The project will also include a new kayak/canoe launch and boardwalk facilities. Approximately 1 acre of dune habit will also be restored as a part of the project. The dune restoration would involve planting gaps in the existing dunes within the project area. *** Navarre Beach Park Gulfside Walkover Complex: The restoration work proposed includes constructing an entrance, driveway, and parking area; constructing a restroom facility; constructing pavilions with boardwalk connections; observation tower or deck; and constructing a dune walkover that will provide access to the beach. This project will be constructed between the two existing beach pavilions and will complement the architectural designs of these existing facilities.