Miccosukee Community Park

> Miccosukee Community Park

Miccosukee Community Park

Miccosukee Community Park

Client: Leon County Public Works Dept. of Parks and Recrea
Location: Leon County, FL
Size: Approx. 20 Acres
Service: Parks & Recreation

Highlights:
Contact Staff: Mark T. Llewellyn Sr., P.E.
 

Genesis developed a master plan for ultimate buildout of the property utilizing a list of priorities developed by the community. 

The plan included:

  • Expansion of parking areas;
  • Additional picnic facilities;
  • Construction of tennis courts and;
  • Installation of a playground for small children.

A sidewalk plan was provided to enhance connectivity to all future elements.

Full construction documents were prepared and permits were acquired to expand the existing ball field into a multi-use facility for adult baseball and youth soccer.

The design included:

  • A new stormwater treatment facility;
  • A timber retaining wall; and;
  • Regulation height fencing for the base-ball field.

The project included identification of a conservation area for mitigation of tree removals as well as delineation of a walking/jogging trail and lighting for both the ball field and basketball courts.

www.GenesisGroup.com

Miccosukee Community Park


Leon County, FL

Client:

Leon County Public Works Dept. of Parks and Recrea

Location:

Leon County, FL

Size:

Approx. 20 Acres

Service

Parks & Recreation

Highlights:

Engineering
Environmental Permitting
Master Planning
Stormwater Analysis and Solutions Design

Miccosukee Community Park

Genesis developed a master plan for ultimate buildout of the property utilizing a list of priorities developed by the community. 

The plan included:

  • Expansion of parking areas;
  • Additional picnic facilities;
  • Construction of tennis courts and;
  • Installation of a playground for small children.

A sidewalk plan was provided to enhance connectivity to all future elements.

Full construction documents were prepared and permits were acquired to expand the existing ball field into a multi-use facility for adult baseball and youth soccer.

The design included:

  • A new stormwater treatment facility;
  • A timber retaining wall; and;
  • Regulation height fencing for the base-ball field.

The project included identification of a conservation area for mitigation of tree removals as well as delineation of a walking/jogging trail and lighting for both the ball field and basketball courts.