I-75 (SR 93) Widening

> I-75 (SR 93) Widening

I-75 (SR 93) Widening

I-75 (SR 93) Widening

Client: Keystone Civil, Inc.
Location: Hernando County, FL
Size: 6.25 miles; Construction Cost: $96 million
Service: Construction Engineering & Inspection

Highlights:
Contact Staff: Bradley (Brad) F. Post, P.E.
 

Genesis CEI is a subconsultant on the I-75 (SR 93) from South of US 98/SR 50/Cortez to North of US 98/SR 50/Cortez and I-75 (SR 93) from North of SR 50 to Hernando/Sumpter Count Line project. This is a 1,100-day, $96-million, 6.25-mile design/build project that will widen I-75 from four lanes to six lanes and widen SR 50 from four lanes to six lanes with bike lanes. This project also includes pond construction, drainage, Intelligent Transportation System (ITS) installation, high mast lighting, signalization, signing and pavement markings, utilities, guardrail, retaining walls, concrete paving, asphalt paving, sidewalks, widening of both bridges over Croom Rital Road and widening of both bridges over the Withlacoochee River. The interchange at SR 50 will also be reconstructed with two new steel bridges increasing the vertical clearance.

www.GenesisGroup.com

I-75 (SR 93) Widening


Hernando County, FL

Client:

Keystone Civil, Inc.

Location:

Hernando County, FL

Size:

6.25 miles; Construction Cost: $96 million

Service

Construction Engineering & Inspection

Highlights:

Construction Engineering and Inspection
Intelligent Transportation Systems (ITS)
Signalization

I-75 (SR 93) Widening

Genesis CEI is a subconsultant on the I-75 (SR 93) from South of US 98/SR 50/Cortez to North of US 98/SR 50/Cortez and I-75 (SR 93) from North of SR 50 to Hernando/Sumpter Count Line project. This is a 1,100-day, $96-million, 6.25-mile design/build project that will widen I-75 from four lanes to six lanes and widen SR 50 from four lanes to six lanes with bike lanes. This project also includes pond construction, drainage, Intelligent Transportation System (ITS) installation, high mast lighting, signalization, signing and pavement markings, utilities, guardrail, retaining walls, concrete paving, asphalt paving, sidewalks, widening of both bridges over Croom Rital Road and widening of both bridges over the Withlacoochee River. The interchange at SR 50 will also be reconstructed with two new steel bridges increasing the vertical clearance.