East 8th Avenue Water Main Extension

> East 8th Avenue Water Main Extension

East 8th Avenue Water Main Extension

Client: Gulf Coast Metal
Location: Tampa, FL
Service: Public & Civic Infrastructure

Highlights:
Contact Staff: Kyle L. Thornton, P.E.
 

Genesis provided construction plans and civil permitting for the extension of a City of Tampa public water main on East 8th Avenue. The water main was extended from the existing terminus on 9th Avenue south along 71st Street to East 7th  Avenue. The water main size was required by the City of Tampa and also required the installation of fire hydrants. Project included surveying of the existing right-of-way, DEP permitting, construction services, and certifications of completion.

www.GenesisGroup.com

East 8th Avenue Water Main Extension


Tampa, FL

Client:

Gulf Coast Metal

Location:

Tampa, FL

Service

Public & Civic Infrastructure

Highlights:

Civil Engineering
Construction Phase Services
Engineering Design and Permitting

Contact Staff:

Kyle L. Thornton, P.E.

East 8th Avenue Water Main Extension

Genesis provided construction plans and civil permitting for the extension of a City of Tampa public water main on East 8th Avenue. The water main was extended from the existing terminus on 9th Avenue south along 71st Street to East 7th  Avenue. The water main size was required by the City of Tampa and also required the installation of fire hydrants. Project included surveying of the existing right-of-way, DEP permitting, construction services, and certifications of completion.