string(866) " SELECT Projects.*, ProjectConditions.ConditionName, ProjectCategories.CategoryName, GROUP_CONCAT(DISTINCT Services.ServiceName SEPARATOR ', ') ServiceNames FROM Projects LEFT OUTER JOIN ProjectConditions ON Projects.ProjectCondition = ProjectConditions.ConditionID LEFT OUTER JOIN ProjectCategories ON Projects.CategoryID = ProjectCategories.CategoryID LEFT OUTER JOIN ProjectsToServices ON Projects.ProjectID=ProjectsToServices.ProjectID LEFT OUTER JOIN Services subServices ON ProjectsToServices.ServiceID=subServices.ServiceID LEFT OUTER JOIN Services ON (subServices.SubserviceTo=Services.ServiceID) OR (subServices.ServiceID=Services.ServiceID AND subServices.SubserviceTo IS NULL) WHERE Projects.ProjectSlug = 'Blue-Sink-Restoration' " Blue Sink Restoration | Genesis

Blue Sink Restoration

> Blue Sink Restoration

Blue Sink Restoration

Blue Sink Restoration

Client: Suwannee River Water Management District
Location: Suwannee County, FL
Size: 1/8 acre
Service: Parks & Recreation

Highlights:
Contact Staff: Mark T. Llewellyn Sr., P.E.
 

A retaining wall failure during a storm event prompted the Suwannee River Water Management District to seek assistance with the design of a retaining wall that would match the existing improvements and ensure that failure would not occur in the future.

Genesis designed the retaining wall utilizing the existing "Redi-Rock"  components that were part of the failed wall. In order to improve the stability of the wall in future storm events, a sheet-pile retaining wall was specified. The constructed wall achieved the result of providing a restored retaining wall that blended with the existing wall and provided the required resistance to future structural failures.

www.GenesisGroup.com

Blue Sink Restoration


Suwannee County, FL

Client:

Suwannee River Water Management District

Location:

Suwannee County, FL

Size:

1/8 acre

Service

Parks & Recreation

Highlights:

Civil Engineering
Engineering

Blue Sink Restoration

A retaining wall failure during a storm event prompted the Suwannee River Water Management District to seek assistance with the design of a retaining wall that would match the existing improvements and ensure that failure would not occur in the future.

Genesis designed the retaining wall utilizing the existing "Redi-Rock"  components that were part of the failed wall. In order to improve the stability of the wall in future storm events, a sheet-pile retaining wall was specified. The constructed wall achieved the result of providing a restored retaining wall that blended with the existing wall and provided the required resistance to future structural failures.