Academic Way 16-Inch Water Main

> Academic Way 16-Inch Water Main

Academic Way 16-Inch Water Main

Academic Way 16-Inch Water Main

Client: Florida State University
Location: Tallahassee, FL
Service: Public & Civic Infrastructure

Contact Staff: David W. Hutcheson, P.E., PSM
 

A recent feasibility analysis evaluated alternatives for increasing the vertical clearance under the existing Woodward Avenue bridge. It was determined that the preferred option was to leave the bridge in place and lower the profile of Academic Way. The proposed improvements will include demolition of the existing roadway pavement, sidewalk and curbing; excavation of the roadway base and subgrade materials within the limits required for a new lower profile; protection of the exposed bridge piles and pile caps; lowering the existing drainage inlets; modification of the existing water line; and construction of new roadway, curb, sidewalk and drainage. Genesis is providing professional services to design these improvements and to prepare construction drawings.

www.GenesisGroup.com

Academic Way 16-Inch Water Main


Tallahassee, FL

Client:

Florida State University

Location:

Tallahassee, FL

Academic Way 16-Inch Water Main

A recent feasibility analysis evaluated alternatives for increasing the vertical clearance under the existing Woodward Avenue bridge. It was determined that the preferred option was to leave the bridge in place and lower the profile of Academic Way. The proposed improvements will include demolition of the existing roadway pavement, sidewalk and curbing; excavation of the roadway base and subgrade materials within the limits required for a new lower profile; protection of the exposed bridge piles and pile caps; lowering the existing drainage inlets; modification of the existing water line; and construction of new roadway, curb, sidewalk and drainage. Genesis is providing professional services to design these improvements and to prepare construction drawings.