Missouri Ave.

> Missouri Ave.

Missouri Ave.

The Missouri Avenue Stormwater Improvement project involved replacement of existing stormwater collection system to alleviate flooding in the downtown area in accordance with the City's adopted Stormwater Management Plan. Stormwater quality was achieved via a combination of underground treatment facilities and wetland plantings located along the perimeter of Orange Lake (for nutrient uptake). Services include: Surveying, design, permitting and construction administration.

Project was funded with Community Development Block Grant (CDBG) and Southwest Florida Water Management District (SWFWMD) grants.

www.GenesisGroup.com

Missouri Ave.


New Port Richey, FL

Client:

City of New Port Richey

Location:

New Port Richey, FL

Service

Public & Civic Infrastructure

Highlights:

Civil Engineering
Construction Phase Services
Engineering Design and Permitting
Irrigation Design
Regulatory Permitting
Roadway Design
Stormwater Analysis and Solutions Design
Surveying

Contact Staff:

Bruce T. Kaschyk, AICP

Missouri Ave.

The Missouri Avenue Stormwater Improvement project involved replacement of existing stormwater collection system to alleviate flooding in the downtown area in accordance with the City's adopted Stormwater Management Plan. Stormwater quality was achieved via a combination of underground treatment facilities and wetland plantings located along the perimeter of Orange Lake (for nutrient uptake). Services include: Surveying, design, permitting and construction administration.

Project was funded with Community Development Block Grant (CDBG) and Southwest Florida Water Management District (SWFWMD) grants.