Lake Rowell Hydrological Restoration

> Lake Rowell Hydrological Restoration

Lake Rowell Hydrological Restoration

Lake Rowell Hydrological Restoration

Client: Suwannee River Water Management District
Location: Union County, FL
Size: 2.44 Acres

Highlights:
Contact Staff: Echo K. Gates, LEED®AP
 

Genesis was retained to investigate the hydraulic effects of removing approximately 0.8 miles of the southerly berm on Alligator Creek that lies immediately adjacent to Lake Rowell. The site had been proposed as a wetland mitigation site for 2.44 acres of impact wetlands from the reconstruction of the New River Bridge in Union County, Florida at CR 229.

The efforts to determine these effects included gathering topographic data from the area under study, obtaining existing stormwater models for Alligator Creek and numerically modeling the modified channel using the acquired survey information.

www.GenesisGroup.com

Lake Rowell Hydrological Restoration


Union County, FL

Client:

Suwannee River Water Management District

Location:

Union County, FL

Size:

2.44 Acres

Service

Highlights:

Stormwater Modeling Study
Topographic Data Collection
Wetland Permitting & Mitigation

Contact Staff:

Echo K. Gates, LEED®AP

Lake Rowell Hydrological Restoration

Genesis was retained to investigate the hydraulic effects of removing approximately 0.8 miles of the southerly berm on Alligator Creek that lies immediately adjacent to Lake Rowell. The site had been proposed as a wetland mitigation site for 2.44 acres of impact wetlands from the reconstruction of the New River Bridge in Union County, Florida at CR 229.

The efforts to determine these effects included gathering topographic data from the area under study, obtaining existing stormwater models for Alligator Creek and numerically modeling the modified channel using the acquired survey information.