Falkenburg Road Force Main

> Falkenburg Road Force Main

Falkenburg Road Force Main

Falkenburg Road Force Main

Client: Centex Homes
Location: Riverview, FL
Size: 2.5 Mile 20-Inch Forcemain
Service: Public & Civic Infrastructure

Highlights:
Contact Staff: Bruce T. Kaschyk, AICP
 

Genesis designed, permitted, and provided construction management, for a 20-inch force main extension within unincorporated Hillsborough County to support construction of the Magnolia Park development.

The pipeline was constructed along Falkenburg Road between Causeway Boulevard and Progress Boulevard. The 2.5 mile public pipeline extension involved numerous utility adjustments to resolve discrepancies with the existing as-built drawings.

The project utilized the innovative design solution of locating the pipeline within the center median in order to minimize conflict with existing buried roadside utilities within a constrained right of way width.

www.GenesisGroup.com

Falkenburg Road Force Main


Riverview, FL

Client:

Centex Homes

Location:

Riverview, FL

Size:

2.5 Mile 20-Inch Forcemain

Service

Public & Civic Infrastructure

Highlights:

Civil Engineering
Construction Administration
Construction Phase Services
Engineering Design and Permitting
Regulatory Permitting
Water & Wastewater Engineering

Contact Staff:

Bruce T. Kaschyk, AICP

Falkenburg Road Force Main

Genesis designed, permitted, and provided construction management, for a 20-inch force main extension within unincorporated Hillsborough County to support construction of the Magnolia Park development.

The pipeline was constructed along Falkenburg Road between Causeway Boulevard and Progress Boulevard. The 2.5 mile public pipeline extension involved numerous utility adjustments to resolve discrepancies with the existing as-built drawings.

The project utilized the innovative design solution of locating the pipeline within the center median in order to minimize conflict with existing buried roadside utilities within a constrained right of way width.