Polk Drive Stormwater Treatment Facility
Leon County, FL
Client:
Polk Drive Stormwater Treatment Facility
Location:
Leon County, FL
Size:
600 LF of RoadwayService:
Public & Civic Infrastructure
Highlights:
Polk Drive Stormwater Treatment Facility
Genesis Group completed surveying, permitting, and engineering services to provide an extension of Polk Drive to accommodate right-of-way acquisition for the Orange Avenue widening.
This project included a significant stormwater and floodplain management system to accommodate additional floodplain fill due to the Polk Avenue widening and future expansion to adjacent property.
The stormwater facility and floodplain compensation areas were seamlessly integrated into the East Branch Ditch system. Constructability, maintenance issues and erosion control were of paramount importance for the proposed stormwater management system.
This project also includes the regrading and stabilization of the East Branch Ditch for approximately 300' with Geo-Web slope stabilization.




Linked In
Twitter