Tampa Tallahassee Jacksonville Gainesville, Thomasville, engineering,  landscape architecture, planning, surveying, GIS, and urban design

Orange Avenue Reconstruction

Orange Avenue Reconstruction, Transportation & Mobility - 2007.05.16_031.jpg

Genesis Group prepared plans and contract documents to reconstruct Orange Avenue from a two-lane roadway to a four-lane divided roadway. Major components of the project included:

  • Replacing an existing signalized intersection with a 2-lane round-about;
  • Enclosing nearly 4500’ ditch with a double 6' x 14’ concrete box culvert;
  • In-street bike lanes;
  • Sidewalks;
  • Screening walls;
  • Three signalized intersections;
  • A 3-acre stormwater management facility with an extensive stormwater conveyance system.
  • Roadway plans, structure plans, landscape plans and right-of-way maps were prepared utilizing CADD and were based on surveys completed with state-of-the-art electronic data collection systems. Total construction costs for this project was $23 million.
  • Genesis also provided public involvement services, which included: preparation of exhibits; conducting public meetings; and attending homeowner association meetings. The right-of-way acquisition support services included:
    • Cost-to-cure analysis;
    • Mediation assistance; and
    • Expert witness testimony.

Client

Leon County, Public Works

Location

Tallahassee, FL

Size

1.75 miles

Service

Transportation & Mobility

Highlights

Environmental Permitting

Landscape Design

Right of Way Mapping

Roadway Design

Stormwater Analysis and Solutions Design

Surveying

Contact Staff

Jim Sullivan , P.E.

- Select a service area above -
Tampa
813.620.4500
Tallahassee
850.224.4400
Jacksonville
904.730.9360
www.GenesisGroup.com

Orange Avenue Reconstruction


 Tallahassee, FL