Orange Avenue Reconstruction
Tallahassee, FL
Client:
Leon County, Public Works
Location:
Tallahassee, FL
Size:
1.75 miles
Service:
Highlights:
Orange Avenue Reconstruction
Genesis Group prepared plans and contract documents to reconstruct Orange Avenue from a two-lane roadway to a four-lane divided roadway. Major components of the project included:
- Replacing an existing signalized intersection with a 2-lane round-about;
- Enclosing nearly 4500’ ditch with a double 6' x 14’ concrete box culvert;
- In-street bike lanes;
- Sidewalks;
- Screening walls;
- Three signalized intersections;
- A 3-acre stormwater management facility with an extensive stormwater conveyance system.
- Roadway plans, structure plans, landscape plans and right-of-way maps were prepared utilizing CADD and were based on surveys completed with state-of-the-art electronic data collection systems. Total construction costs for this project was $23 million.
-
Genesis also provided public involvement services, which included: preparation of exhibits; conducting public meetings; and attending homeowner association meetings. The right-of-way acquisition support services included:
- Cost-to-cure analysis;
- Mediation assistance; and
- Expert witness testimony.